Trenchless Technology

JAN 2019

Trenchless Technology is the premier communications vehicle for the trenchless industry. Through our multiple platforms, readers receive insights into the trenchless industry, as well as keep connected to the latest news, products and projects.

Issue link: http://digital.trenchlesstechnology.com/i/1072290

Contents of this Issue

Navigation

Page 53 of 67

Green MON. MAY 6, 2019 PRE-COURSES 8:30 AM - 12:00 PM • Utility Construction Damage Prevention and Risk Mitigation 8:30 AM - 4:30 PM • Introduction - Trenchless Construction Methods • Microtunnelling Construction Means, Methods, and Design • Culverts Renovation and Replacement Using Trenchless SolutionUtility 1:00 PM - 4:30 PM • Manhole Deterioration and Renovation TUES. MAY 7, 2019 SESSION 1: Successful HDD Projects 8:00 AM - 8:30 AM Mitigating Inadvertent Returns Through Proper Bore Planning and Minimizing Down Mud Pressure Through HDD Best Practices 8:30 AM - 9:00 AM Reclaiming and Solidifying: Managing the Rising Costs of Fluid Disposal 9:00 AM - 9:30 AM Slave Lake Raw Water Intake 10:00 AM - 10:30 PM Reducing the Risk of Cross Bores 10:30 AM - 11:00 AM Horizontal Directional Drilling SESSION 2: Water and Sewer Inspection 8:00 AM - 8:30 AM Results from the City of Roseville, California's 3-Year $4.5 Million Post-CIPP Investigation 8:30 AM - 9:00 AM Proactively Removing HS - Prevent Odour Complaints and Corrosion Within Underground Structures 9:00 AM - 9:30 AM Enhanced Inspection and Condition Assessment - Evaluate the Rate of Corrosion of the Primary Trunk 10:00 AM - 10:30 AM Objective Decision Making Using Multi- Sensor Internal Diameter Measurements 10:30 AM - 11:00 AM Novel Laser Profiler With Inertial Sensors for Diameter, Ovality and Inclination Measurements SESSION 3: Trenchless Project Planning and Design 8:00 AM - 8:30 AM Federal Regulatory Update "Damage Prevention Implications of Bill C-69 and the Proposed Canadian Energy Regulator Act 8:30 AM - 9:00 AM Use of Utility Engineering During Large Scale Projects Assisting Design Not Change Orders 9:00 AM - 9:30 AM Geospatially Correct SUE 10:00 AM - 10:30 AM WWTP Yard Piping and Structure Inspection and Condition Assessment and Use Work at Annacis Island as a Case Study 10:30 AM - 11:00 AM I&I Reduction Using Grouting 11:15 AM - 2:00 PM EXHIBIT HALL AND DEMOS SESSION 4: New Pipe Construction Using Microtunnelling 2:00 PM - 2:30 PM Slurry Mixshield Technology: Ideal for Mechanized Cross Passage Construction in Formations with High Groundwater Table 2:30 PM - 3:00 PM 2.8 KM of Multiply Curved Microtunnels Below Road and Railways, Around Sheetpiles and Tiebacks 3:00 PM - 3:30 PM Advancements in Slurry Microtunneling for Long Distance and Curved Tunnels 3:30 PM - 4:00 PM West Gormley Sanitary Sewer - Unlocking Land 4:00 PM - 4:30 PM Constructing the South Surrey Interceptor Trenchless Segment 4:30 PM - 5:00 PM Microtunneling SESSION 5: Sewer Pipe Renovation 2:00 PM - 2:30 PM Advances in CIPP UV Liners for Felt Based Gravity and Pressure Pipe Systems 2:30 PM - 3:00 PM CIPP Success for Hespeler Trunk Sanitary Sewer 3:00 PM - 3:30 PM Trenchless Rehabilitation of the Humber Sanitary Trunk Sewer 3:30 PM - 4:00 PM 500-Year Extension of Sewer Line Life Using Fiberglass Pipe Slipliner 4:00 PM - 4:30 PM How Successful is My Pipe Bursting Project? GOLD SPONSOR: SILVER SPONSOR: MAY 7-8 Pre-Courses May 6 Richmond/Vancouver, BC C A N A D A Go Tren Go G

Articles in this issue

Links on this page

Archives of this issue

view archives of Trenchless Technology - JAN 2019